Call (571) 619-8115Shipping resourcesFree toolsMy estimatesContact
Free checklist and score

The Shipper's Quote-Ready Checklist. Twelve details, one readiness score.

Tick what you already know about the load. The score shows how complete your details are, which missing items change the price most, and what a carrier will still ask. The one-page PDF is free too.

Averstone Logistics LLC is a Missouri-based logistics company preparing its FMCSA property-broker registration. Until it is active, we do not arrange or quote shipments. Tell us about your freight and we'll contact you the day we open.

Want paper? Print the one-page PDF instead; printing this web page gives a long, unformatted copy.

Score your freight details

Pick the trailer, then tick each detail you could hand a carrier right now. Every item says why a carrier asks for it. The points follow what changes a price most, so the lane, dates, weight and dimensions count for more than contact names. Your ticks stay in this browser. Our analytics only learns the score band and the trailer you pick.

Nothing here is required. Tick the details you have; every unticked detail is listed as missing in the score panel.

What will it ship on?

Each trailer adds two or three details of its own. "Not sure" adds the two that help pick a trailer.

0/100 · Expect follow-up questionsWhat's missing ↓
The 12 core details
Dry van extras
Flatbed extras
Hotshot extras
Not sure which trailer? Two extras
Readiness score
0/100

Expect follow-up questions

A carrier would come back with questions first. Start at the top of the list below.

Still missing, most points first

  1. Origin and destination14 pts
  2. Dimensions12 pts
  3. Total weight12 pts
  4. A photo or spec sheet12 pts

+ 10 more (all of them are in the copied checklist)

Tell us about your freight

The amber button adds your score and missing items to the notes on our form; they reach us only if you submit that form. Your ticks are saved only in this browser and show up later on My Estimates. From this tool our analytics sees the score band and trailer type, nothing else.

Planning aid only. The score measures how complete your details are, not whether a load can move or what it will cost. Point values are Averstone Logistics' own weighting of which details change a price or a schedule most; carriers may ask for more.

Prefer paper?

The PDF has the same twelve core details on one printable page to tick off. Keep a copy with each shipment's records.

Free download

The Shipper's Quote-Ready Checklist

One page. Every detail a carrier needs to price your freight right the first time.

Instant download. We may follow up once about it, and we never sell your details. Privacy policy.

Why each item matters

A freight quote is only as good as the information behind it. When a detail is missing, whoever is quoting has two choices: stop and ask, or guess. Guessing is how quotes change after booking, or how the wrong truck shows up. Some details mostly move the price, some mostly move the schedule, and several move both.

The twelve core checklist items in three columns: those that mainly change the price, those that change both price and schedule, and those that mainly change the schedule, with each item's points. Below, the extra items each trailer type adds.Changes the price43 of the 100 core pointsTotal weight12Dimensions12Piece or pallet count7Commodity description7Stackability5Changes price and schedule47 of the 100 core pointsOrigin and destination14Ready date and time10Delivery date and time10Loading and unloading7Special handling6Changes the schedule10 of the 100 core pointsAppointment requirements6Contacts and references4Few points, but a missedappointment or a missingcontact leaves a truck waiting.Trailer extras: +20 points, depending on the trailer you pickDry van: footprint 8 · appointment owner 6 · POs 6Flatbed: tarp 7 · legal size 7 · securement 6Hotshot: exact weight 8 · deck 6 · loading gear 6Not sure: photo or spec sheet 12 · last shipment 8Dot size follows the points. Ready to send = 85 or more, with nothing worth 10+ points missing.
Where the 100 core points sit. Weight and dimensions mostly change the price; the lane, both dates, loading and special handling change the price and the timing; appointments and contacts carry few points but decide whether the truck waits. The trailer you pick adds 20 points of its own details.

Lane and facility type

ZIP codes set the lane and the mileage, but the facility type matters almost as much. A dock-to-dock move between two warehouses is very different from a delivery to a jobsite with a gravel road, or a retail DC with strict appointment rules. Facility type tells a carrier what equipment fits and what to ask next.

Dates and times

The ready date and the required delivery date together set the transit window. If the window is tight, the load may need a dedicated or expedited plan. If it's flexible, there may be more economical options. Be honest about the ready time: a truck that arrives before the freight is ready can lead to detention charges.

Commodity, count and dimensions

What the freight is and how it's packaged tells a carrier whether it belongs in a dry van, on a flatbed or on a hotshot. Count and dimensions show how much deck or floor space it uses, and whether anything is too tall, wide or long for standard equipment. Measure as it ships, on the pallet or in the crate. These details also end up on the paperwork: a motor carrier's bill of lading must show the shipper and receiver, the origin and destination, the number of packages, a description of the freight and, where it affects the rate, its weight, volume or measurement (49 CFR 373.101).

Weight and stackability

Legal weight limits often cap a trailer before space does, especially for dense freight like beverages, paper or metal. On the Interstate the whole rig, truck, trailer and freight together, is held to 80,000 lb gross (FHWA size and weight overview, May 2003). Stackability changes how many floor positions the load needs, which can turn a full truckload into a partial or the other way around. As a rule of thumb, a 53 ft dry van takes about 26 pallets of 48 × 48 that cannot stack, more if they can be stacked, weight permitting. The pallet calculator runs the numbers for your pallets.

Loading, unloading and appointments

Whether freight loads at a dock, by forklift from the side or by crane decides the trailer type. Appointment requirements, and especially who books them, decide scheduling and how much waiting time the truck is exposed to. FMCSA's February 16, 2024 notice on driver detention says industry, government and researchers have commonly defined detention as more than 2 hours of dwell time at a facility. These are the details most often left out, and the ones most likely to cause extra charges; the accessorial charges guide shows what published schedules list for waiting time.

Special handling and contacts

Tarps, upright-only freight, high-value goods and any hazmat information from the shipper all affect equipment and planning. For hazardous materials the duty sits with the shipper: under 49 CFR 172.200, each person who offers a hazardous material for transportation describes it on the shipping paper. Contact names and reference numbers keep pickup and delivery moving: the driver knows who to call and the receiver can match the load to the order.

The trailer extras

Dry van. The receiver usually sets the rules. Pallet footprint and whether pallets turn or stack decide floor positions; PO numbers by pallet let a distribution center check the load in; and a named appointment owner with a confirmation number keeps the slot from falling between shipper, receiver and carrier. The retail DC delivery guide covers what receivers check at the door.

Flatbed. The load rides in the open, so three things come up on every call. Tarps: whether the load must stay dry, which tarp, and how far it hangs down the sides. Size: a load over 102 inches wide needs an oversize permit (23 CFR 658.15), and while there is no federal height limit, FHWA lists state limits from 13.6 to 14.6 feet. Securement: 49 CFR 393.110 sets the minimum number of tie-downs by each piece's length and weight, so the driver needs to know where chains or straps can attach.

Hotshot. Margins are thin on a light truck, so the exact weight including crating and attachments, the feet of deck the load uses, and the loading equipment at both ends (a hotshot has no liftgate) decide whether one truck can do it at all.

Not sure. A photo with a tape measure in frame, or a spec sheet, plus how it shipped last time, answers most equipment questions in one step. The trailer selector in the sidebar narrows it down in five questions.

Worked example (illustrative)

A fabricator has six bundles of structural steel, each 30 ft long, going from its plant to a jobsite on a flatbed. They know the lane, the ready date, the commodity, the count, the dimensions, the weight, the loading method (forklift at the plant, crane at the jobsite), that the jobsite needs no appointment, the special handling (edge protection), the legal size and the securement points. They have not yet confirmed the delivery date, whether the bundles can stack, the jobsite contact, or the tarp.

Core points ticked: 14 + 10 + 7 + 7 + 12 + 12 + 7 + 6 + 681 of 100
Flatbed extras ticked: legal size 7 + securement 613 of 20
Score: (81 + 13) ÷ 120 = 0.783, × 100, rounded78: Almost there
Still missing, most points firstDelivery date 10 · tarp 7 · stackability 5 · contacts 4
After confirming the delivery date: 104 ÷ 120 = 0.86787: Ready to send (nothing worth 10+ points left)
Securement check: a 30 ft bundle not blocked against forward movement needs 2 tie-downs for the first 10 ft plus 1 for each further 10 ft (49 CFR 393.110)2 + 2 = 4 per bundle at minimum

The note the button adds to our form would read: "Checklist: 87/100; missing: Tarp need and drop, Stackability, Contacts and references".

Ready to use it? Fill out the checklist and keep it with your shipping records. Have freight coming up? Tell us about it and paste in what you have, or call us and read it off the page. We'll contact you the day our registration is active.

Quote-Ready Checklist FAQ

Is the Quote-Ready Checklist really free?

Yes. Enter your work email and the PDF downloads right away. We may follow up once about your freight. No newsletters and no list selling. The scorer on this page needs no email at all.

Do I need every item on the checklist before I ask for a quote?

No. Share what you know and expect follow-up questions on the rest. The score shows which missing items matter most: start with anything worth 10 points or more: the lane, the dates, the weight and the dimensions, plus the photo or spec sheet if you picked Not sure. The more you can fill in, the fewer questions come back and the more accurate the first quote you receive.

How is the readiness score worked out?

Each item carries points for how much it tends to change a price or a schedule, in our judgment: origin and destination 14; dimensions and total weight 12 each; ready and delivery dates 10 each; commodity, piece count and loading 7 each; appointments and special handling 6 each; stackability 5; contacts 4. That is 100 for the core list, and the trailer you pick adds 20 points of extras. Your score is the points you have ticked divided by the points available, times 100, rounded. 85 or more with nothing worth 10 points or more missing reads "Ready to send"; any other score of 60 or more, including a high score with a 10-point item still open, is "Almost there"; below 60 is "Expect follow-up questions". The weights are ours, not an industry standard.

Does the checklist work for flatbed and hotshot, or just dry van?

It works for all three. Pick the trailer at the top of the scorer and it adds the extras that trailer needs: pallet footprint, PO numbers and the appointment owner for dry van; tarp, securement points and a legal size check for flatbed; exact weight, deck length and loading equipment for hotshot. For open-deck freight, our Open-Deck Load Prep Sheet adds more detail on securement, tarping and unloading equipment.

Why does weight matter so much if my freight takes up the whole trailer?

Trucks have legal weight limits: on the Interstate the whole rig, truck, trailer and freight together, is held to 80,000 lb gross (FHWA size and weight overview, May 2003). Dense freight often hits the weight limit before it fills the space. Accurate weight tells a carrier which equipment can legally carry the load and keeps a quote from changing later.

Is my checklist saved or sent anywhere?

Your ticks and trailer choice are saved in your browser's local storage on this device, so they are still there when you come back; the Reset button clears them. The items you tick and the list you copy are never sent to us; when your score band or trailer changes, our analytics receives just those two labels. The button under the score only puts your score and missing items into the notes box of our form in this browser tab, and they reach us only if you submit that form.

What should a good written quote include?

The lane, equipment, dates, the rate, what's included (fuel, tarps, detention free time) and any conditional charges, plus a note that it is non-binding until confirmed in writing. If you tell us about your freight now, we'll contact you the day our registration is active.

Checklist done? Tell us about your freight.

Tell us about it. We'll contact you the day we open.

We answer every message within 30 minutes, Mon–Fri 8am–5pm ET, and within 6–12 hours at other times.

Notify me when we open

Leave an email address or a phone number and we'll contact you the day our FMCSA registration is active. Nothing is arranged or quoted before then.

Email or phone: either one is enough.

We use your details only to reach you about this. Privacy policy.